1-20 ton gas/oil fired boiler
Capacity: 1-20 ton/h
Pressure: 0.7-2 Mpa
Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.
Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.
7-70 MW gas/oil fired hot water boiler
Capacity: 7-70 MW
Pressure: 1.0-1.6 Mpa
Fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, LPG, diesel, heavy oil, light oil, crude oil, etc.
Industries: Heat supplying, hospital, colleges and universities.
2.8-29mw coal fired boiler
Capacity: 2.8-29mw
Pressure: 1.0-1.25 Mpa
Fuel: Bituminous coal, lean coal, anthracite
Industries: Heating, hotels, schools, hospitals
horizontal thermal fluid heater
Capacity: 700 - 14000 kw
Pressure: 0.8 - 1.0 Mpa
Fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil
Industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries
1-20 ton biomass fired boiler
Capacity: 1-20 ton/h
Pressure: 0.7-2.5 Mpa
Fuel: Biomass particles
Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital

Boiler ( 210MW )
NTPC LTD. BADARPUR THERMAL POWER STATION (BTPS). 705 MW. Electrical Driven. Boiler ( 210MW ): MS/HRH Temp:540/540 Degree,. Turbine( 210MW ):

3. Description of 210 MW PCF Boiler under Study 3.1 - Shodhganga
21 Mar 1971 Nasik Thermal Power Station comprises of 2x140 MW and 3x210 NTPS Stage- II comprises of three units of 210 MW each of BHEL Make. The.

chapter 2 study of 210 mw boiler system - Shodhganga
the schematic diagram of a boiler furnace in a 210 MW coal fired thermal power plant and depicts the path of combustion products. The boiler converts.

Design of superheater for 210 MW thermal powerplant final
3 Sep 2017 SIMPLIFIED LAYOUT OF A THERMAL POWER PLANT 3. SCHEMATIC DIAGRAM OF A BOILER FURNACE IN 210 MW THERMAL POWER

210 MW Boiler Construction 1 | Boiler | Furnace - Scribd
210 MW Boiler Construction 1 - Download as Word Doc (.doc / .docx), PDF File Boiler · Air Preheater in Thermal Power Plant Problem n Sol · Technical Diary.

Statistical modeling of an integrated boiler for coal fired thermal
[20] developed mathematical model for the 210 MW coal-fired boiler for which MPC controller was designed to control the steam from superheater. A general

SUPER HEATER HEADER 11 AND 12 OF 210 MW BOILER
20 Aug 2013 - 2 min - Uploaded by THERMALPOWERPLANTVID SUPER HEATER HEADER 11 AND 12 OF 210 MW BOILER . SURYADEV POWER 80 MW x

INSIDE THE BOILER OF A 210 MW BOILER - YouTube
20 Aug 2013 - 2 min - Uploaded by THERMALPOWERPLANTVID INSIDE THE BOILER OF A 210 MW BOILER . THERMALPOWERPLANTVID Power station

What is auxiliary boiler in power plant ? - Quora
9 Sep 2016 We call it Package boiler in a 210 MW unit thermal power plant . I am not sure, whether the Auxiliary Boiler and Package boiler are same or not. But I am

Performance Analysis and Efficiency Improvement in 210 MW LMW
in 210 MW LMW Turbines at METTUR Thermal. Power Station . A.Sivashankar1, G.Arulgandhi2. 1 M.E Student, Department of Mechanical Engineering, Jayam

TECHNICAL FEATURES Yeniköy Kemerköy
Kemerköy Thermal Plant consists of 3 units and each unit has 210 MW of to Kemerköy TP consists of 1 steam turbine, 1 steam turbine generator, 1 boiler ,

(PDF) Enhancing energy efficiency of boiler feed pumps in thermal
4 May 2017 Keywords: Energy efficiency, boiler feed pumps, auxiliary power, pump efficiency, sec, . In a 210 MW power plant BFP is supplied along with.

210mw power plant boiler - WUXI ZOZEN BOILERS CO.,LTD
WNS Series Gas-fired hot water boiler Introduction. WNS series horizontal internal combustion boiler is a boiler shell type 3 passes wetback oil/gas fired boiler .

Improving The Efficiency Of Thermal Equipments Of 210 MW - IJERT
from a 210 MW thermal power plant under operation in India. while a decrease in energy efficiency when the whole plant including the boiler is considered.

Performance Analysis of 210 Mw at NTPC Vindhyachal - Inpressco
13 Jan 2017 Performance Analysis of 210 Mw at NTPC Vindhyachal, Singrauli Keywords: Coal fired power plant , rankine cycle, boiler efficiency, turbine

Performance of Coal Based Thermal Power Plant at Full Load and
Performance Analysis of Thermal Power Station at the operating conditions of the steam power plant at full load of 210 MW and part load of 195.86 MW.

STEAM BOILER
Belovo GRES, 210 MW power unit;. Nazarovo GRES, 500 MW power unit. The main goal of ZiO-Podolsk and EC. ZIOMAR boiler manufacturers is the creation

210 MW Simulator - NPTI, Badarpur
A prototype of control room of a 210 MW unit of NTPC Badarpur The thermal power plant simulator model is ideally suited for both the Boiler Water System